Return toMain Menu  
First time in St. Maarten - Irony being hauled at Bobby's Airport Marina - 2005

 

 

On our second trip to SXM we started sanding and priming the
whole boat. - 2008

Extending the swim platform - red is the addtional part.

Exhaust was moved from back to the sides and under water.

Copper coat was put on the bottom.


 

We replaced the flooring in Galley and Fwd stateroom - 2010

Continuing to work in the Galley we expanded it and Jim built custom cabinets -2011- 2012

Corian countertops still to be installed.

 

At the same time he started working on building a hard top. 2011 - 2013

 

The top was lifted by crane and is being attached to the bridge of the boat

 

New top with mast completed.

New Console was designed and built, then primed and painted.

 

 

 

 

 

The entranceway to the bridge was completely torn out, redesigned and built.

 

 

Return toMain Menu